Template

RFP Scoring Sheet

An RFP scoring sheet with criteria, weights fixed before vendors respond, written scoring anchors and a dissent column, built to stop evaluation drifting towards the best-written response.

Objectivity starts to decay the moment responses arrive; within a week everyone has a favourite. This sheet locks the criteria, weights and anchors while the field is still blank, and gives disagreement a column of its own instead of a corridor. Use it as it stands; nothing on this page is gated.

Last reviewed 3 July 2026 · Free and ungated

Pressure-test your shortlist

Before the recommendation is written, put the scored shortlist to selected senior operators who have bought in this category and lived with the results. Confidential, through a complimentary first report.

Pressure-test your shortlist

How a client brief works · What you receive

Weights move after the responses arrive. Stop them.

The commonest form of RFP rigging involves no dishonesty at all. The team reads the responses, forms a preference, and then finds the weights "need recalibrating", always in the direction of the front-runner. The countermeasure is procedural: the weight column is agreed, signed and dated before the response deadline, and any later change must record, in writing, which vendor it benefits. Most proposed changes do not survive that sentence being written.

The scoring sheet

Criterion Weight What a 5 reads like What a 2 reads like
Understanding of the requirement 15 Restates your problem with insight you did not hand them, and flags gaps in your own RFP Your document paraphrased back with the company name changed
Proposed solution fit 20 Each requirement mapped to what exists today, what needs configuration and what must be built Capability asserted everywhere, demonstrated nowhere, roadmap and product indistinguishable
Assumptions and exclusions 10 Stated plainly in one section, with the commercial consequence of each "No assumptions noted", which means they exist and you will meet them after signature
Pricing transparency 15 All-in pricing across the contract life, with unit rates for changes and growth A confident year-one number, later years "to be agreed", expenses undefined
Delivery team and plan 15 Named people with relevant CVs and committed percentages, and a plan that shows your obligations too An organisation chart of roles, "resources confirmed on award", your effort absent
Relevant evidence 10 References at your scale that you may contact directly, without the vendor on the call Polished case studies with no contactable client behind them
Contractual position 10 Your terms accepted, or specific redlines provided now with reasons All contractual matters deferred until after selection, when your leverage is gone
Response discipline 5 Your questions answered in your structure, within the limits you set Your questions rearranged into their standard sales deck

The dissent column, and why it exists

Scoring meetings average disagreement away: a 4 and a 2 become a 3 that neither scorer believes. The sheet adds a dissent column beside every criterion, where any scorer records an unresolved disagreement in their own words, and those entries travel into the recommendation unedited. The evaluation committee then sees the dispute rather than the mean. Experience says the dissent column predicts post-contract problems better than the scores do, because it captures the doubts that consensus was about to erase.

How scoring sheets get bent out of shape

  • Anchors get abandoned mid-evaluation and 1 to 5 becomes a mood scale, at which point the sheet measures the demo's charisma.
  • The best bid-writing team wins rather than the best vendor: professional responses from mediocre firms outscore honest responses from good ones unless anchors force evidence over prose.
  • Scores are backfilled after the group discussion so the totals match the room's emerging preference, reversing the entire point of independent scoring.
  • The dissent column is summarised in the final report as "minor reservations", and the one person who spotted the delivery risk goes unrecorded.

When the completed sheet warrants an outside reading

A finished scoring sheet ranks the responses you received against the questions you asked. It cannot tell you whether the winning response will survive contact with delivery, because the claims it scores are written by people paid to write them well. When the top two scores sit close together, or the winner's margin rests on claims only lived experience can test, have the sheet and the shortlist read by senior operators who have run these vendors on the buying side. It is the cheapest point in the whole process to be told something unwelcome.

Frequently asked questions

How is this different from the vendor scorecard template?

This sheet scores written RFP responses at the paper stage, with anchors tuned to how documents mislead. The vendor scorecard scores the vendors themselves across the whole evaluation, using demos, references and contract terms as evidence. Run this sheet first to cut the field, then the scorecard on the survivors.

Should vendors see the criteria and weights?

Publish the criteria and the anchors in the RFP itself: response quality improves when vendors know evidence beats adjectives. Keep the weights private. Published weights teach vendors where to concentrate their creative writing.

What if a strong vendor submits a weak response?

Score the response as written, and record the suspicion in the dissent column rather than in the numbers. If the vendor matters, a clarification round is the honest fix. Nudging their score up "because we know they are better than this" is how the sheet stops being an instrument and becomes a costume.

The best response and the best vendor are not always the same company.

Pressure-test your shortlist